Primary Sump Pump, 1/2 HP, 4320, 115/120 V
ZOELLER — Battery Backup Sump Pumps — Primary Sump Pump, 1/2 HP, 4320, 115/120 V
This Battery Backup Sump Pumps from ZOELLER supports day-to-day operations where predictable fit and dependable handling matter.
Quick specs
- Primary Pump Hz: 60
- Flow Rate @ 5 Ft. of Head: 72.0 gpm (Primary); 39.0 gpm (Secondary)
- Secondary Pump Maximum Head: 22 ft
- Length: 10-1/8" (Primary), 7-7/8" (Secondary)
- Manufacturer Part Number: 508-0007
- UPC: 053514383541
Product information
- Manufacturer Part Number: 508-0007
- UPC: 053514383541
- Country of Origin: United States
Dimensions
- Body Dia.: 8 in
- Primary Pump Overall Height: 12 in
- Width at Widest Point: 8 7/8 in
- Discharge Dia.: 1 1/2 in
- Overall Height: 12 in
- Secondary Pump Body Diameter: 7 7/8 in
- Primary Pump Width at Widest Point: 8 7/8 in
- Primary Pump Maximum Solids Diameter: 1/2 in
- Discharge Diameter: 1 1/2 in
- Primary Pump Solids Diameter - Maximum: 1/2 in
- Sump Pit Diameter - Minimum: 18 in
- Min. Sump Pit Dia.: 18 in
- Cord Length: 9 ft
- Diameter: 8" (Primary), 7-7/8" (Secondary)
- Max. Dia. Solids (In.) - Back-Up: 1/2"
- Manufacturers Warranty Length: 3 yr
- Width: 8-7/8"
- Height: 12"
- Max. Diameter Solids: 1/2 in
- Cord Length - Pumps: 9 ft.
- Length: 10-1/8" (Primary), 7-7/8" (Secondary)
Details
- RPM: 3,450 RPM
- Primary Pump Maximum Head: 23 ft
- Primary Pump Hz: 60
- Flow Rate @ 5 Ft. of Head: 72.0 gpm (Primary); 39.0 gpm (Secondary)
- Secondary Pump Maximum Head: 22 ft
- Secondary Pump Amps: 10
- Primary Pump Amps: 9.4
- Secondary Pump HP: 1/3 hp
This Battery Backup Sump Pumps is designed to support reliable operation in demanding environments.
Recommended for planned maintenance programs and selected for dependable day-to-day use.
Highlights
- Clear specification formatting helps reduce ordering mistakes.
- Organized for straightforward purchasing and stocking.
- Suitable for maintenance, repair, and project-based procurement.
- Helps keep specifications consistent across replacements and replenishment cycles.
Notes: Review application constraints and installation requirements to ensure the part meets your needs.